Guides
When You Inherit a Half-Built Project, Throw Out the Percentage First
Nobody Measured the Percentage
A half-built project usually arrives with a number attached. Almost done, just the finishing touches, design is complete and only the integration is left. Nobody measured that number. It is the builder's feeling after counting screens, and at the moment of handover that feeling always runs high. Work already done looks large, work remaining looks small.
Counted by screens, it looks that way for a reason. Screens are visible, and once a signup screen, a list screen and a detail screen exist, half the job feels finished. But the time it takes to make a service actually run goes mostly into what happens after the screens are drawn. A declined payment, the same button tapped twice, an administrator cancelling an order, the build deployed to a server and opened on someone else's phone. None of that shows up in a screen count.
So when you take a project over, the completion figure is best left aside. Ask one thing instead. Can a single customer get from the start to the end right now, signing up, doing what they came to do, paying, and receiving the result. The point where that line breaks is the first row of the remaining work.
Run It Once on a Machine With Nothing on It
Counting what remains starts not by reading the code but by starting it up. "It ran on the previous developer's machine" carries no information. That machine has tools installed, keys saved, and data typed in by hand, and none of that travels with the repository. Where things stop when you clone the repository onto a fresh machine and follow only what the documentation says is the real state of the handover.
It stops in three places, as a rule. Configuration is missing: the database address and third-party keys live outside the repository. Versions do not match: what the documentation names and what was actually used differ. Data is missing: an empty screen appears and nothing beyond it can be reached. All three come back quickly if you ask the previous developer, and take days once contact is gone. That is why the first run happens before the handover closes, while the line is still open.
Once it is running, compare the code on the live address with the code in the repository. Fixes made in a hurry directly on the server and never committed are common, and they vanish the moment the new developer starts working from the repository.
The Remaining Work Splits Into Three Rows
After the first run, write down what remains. Not yet built, built but not working, working but not something you can leave as it is. The previous developer's version of the remaining work was only the first row. The rows the new owner has to count are the second and the third, and that is usually where the time goes.
The second row shows itself when you run the thing. The third only appears when someone reads the code. Secrets embedded in the source, a payment total calculated in the browser and sent to the server, a framework version whose support has ended. It runs today, but every feature stacked on top raises the cost of unpicking it later. Projects built fast with AI tend to have an unusually long third row, and what to look for there is covered in The Code Runs. That Is Not the Same as Being Able to Hand It Over.
The third row is what a new developer finds most of in the first week, and it is where "this all has to be rebuilt" comes from. When that sentence arrives, ask for the reasoning. A rebuild is proposed by almost everyone who takes over someone else's code, often because writing your own is more comfortable than reading theirs. Take the third-row items one by one and sort them into fixable and not fixable. If most are fixable, continue.
Rebuilding Is Only Cheaper Under Specific Conditions
The decision between continuing and rebuilding is not made on whether you like the code. Three things decide it. Does it run on a clean machine. If it does not, and getting it to run takes days, there is no floor yet to build on. Are there real users and real data already. If customers are using the service, a rebuild still has to carry their data across, and migration is priced separately from construction. Are the underlying tools and versions still supported. A framework past end of life or a third-party service that has shut down means the replacement comes first either way.
Of the three, data is the one most often left out. A rebuild quote usually prices a start from nothing, and moving existing customer accounts, orders and posts sits outside it. If the service is already open, a rebuild that looks cheaper has to have the migration cost added before the two options sit on the same line.
The reverse also holds. With no customers, no data, and nothing running on a clean machine, rebuilding is often faster. What to carry over from the old project then is not the code but the decisions: what was agreed to build, what was agreed to leave out, the design files, the third-party contracts. Throw the code away and all of these still apply.
Most of What Needs Settling With the Previous Developer Sits Outside the Code
Taking over brings things that have to be closed out with the previous developer. Start with the contract. Who holds copyright in the deliverables, at what point it transfers, and how the outstanding balance is tied to delivery of those deliverables are all checked in the contract itself. Where a clause is missing, agree it again with the previous developer and put it in writing. A verbal "just use it" is the reason a later developer hesitates to touch the code.
Then ownership of accounts. Domain, server, app store developer account, payment provider, transactional email service, purchased themes, plugins and font licences. If these are registered to the previous developer, you can receive every line of code and the service still sits in their hands. Transferring or recreating them has to be finished while contact is open, and the order of work once contact is lost is set out in The First Week After a Developer Goes Quiet.
Finally, take a copy of the conversations with the previous developer. Chat history, email threads, the issue tracker, whichever it was, because that is where the reasons for the decisions live. Code keeps the result, conversations keep the why. The why is what a new developer asks about most in the first week, and without the record the same decisions get made all over again.
Send the New Developer the Definition of Done, Too
Send a new firm only a repository address and a set of logins and what comes back is a list of questions. What goes with it is a statement of what counts as finished. The original brief or requirements, the items dropped from it this time, the currently reachable address with a test account, the list of known problems, and the three rows of remaining work from above. Only with this bundle does the quote that comes back become a quote for the remaining work.
There is one line to look for in that quote. A quote for an inherited project carries a cost for understanding before the cost for building. That is the time spent reading someone else's code, getting it to run, and writing down where it breaks, and it is spent regardless of how much the previous developer left. A quote without this line either means that time will not be spent or that it has been folded into the build figure. Which one is clear as soon as you ask.
We Answer the Continue-or-Rebuild Question Only After Running It
Weple starts by running the half-built project. Send whatever you currently hold among the repository address, the live address and the accounts you were given, and we bring it up in a clean environment and hand back the breakpoints and the redo items split into the three rows. You can decide between continuing and rebuilding after seeing that list, and if you continue, we fix the breakpoints one job at a time. How general fixes are priced is on the pricing page. The previous developer's completion figure does not need to be forwarded. That number comes out of the first run.
In a similar spot
Send us where things stand and we reply with the scope and the price within 24 hours.